31 December 2019
MVP – Final phase assembling before certification – Prototyping for Jig ONLY – 1st part
- 24v, 36v, 48v micro-mobilities are hooked up
- The jig attachment system to each e-mobility is not good yet
- it is placed on the micro-mobilities and hooked up the Energy Block to test on road.
- Flat road is tested first
- Each 24v, 36v, 48v micro-mobilities are tested
- All working properly with load
31 December 2019
MVP – Final phase assembling before certification – Prototyping for Energy Lock ONLY – 1st part
- Lock MVP Tested with the following
- With no external charging/ Power source solely from Energy Block all running together (Can see video to see the output of current)
- Energy Block
- Light stick charging Via USB A
- Handphone charging Via USB C
- Macbook laptop charging Via DC output
- Lock
- Handphone charging Via QC USB A
- Handphone charging Via QC USB A
- Handphone charging Via QC USB C
- AC output on a hair dryer
- With no external charging/ Power source solely from Energy Block charing kettle @ 8.5 amp
- limited it as the toggle pin is glued up together. Current too high may melt it as of now
- With external charging and Energy Block charing all the things while being charged
- Removing Energy Block while charging Lock and charing all the things
- it works but at a lower current @ 1.2 amp as the ac adaptor is 1.2 amp
- Energy Block
- With no external charging/ Power source solely from Energy Block all running together (Can see video to see the output of current)
29 December 2019
Final phase assembling before certification – Prototyping for Energy Lock ONLY – 1st part
- MVP Lock assembled
- waiting for the bluetooth board to arrive then assemble to make the Lock works. In which it will output both DC & AC
- this version is 110 cm
- *Ideas to explore:
- this version is longer and can be used for developing coutnries
- one more direction to considered is to separate DC & AC output to 2 different lock.
- Example:
- if you want quick charge, then put in the additional adaptor on the block.
- if you want AC, then put in the additional AC output adaptor on the block.
- both can be put together too

29 December 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 4th part
- 2 available Energy Blocks are glued differently with different content, angles, machines and quality of glue
- Another machine is tested and used
- 2nd waterproofing test is carried out and leakges are found
- solutions have been confirmed with rubber, another type of glue and the accuracy of assembly on the USB section
- IP 68 is confident to be achieved from the different specialists (Gluing, rubber sealing, and water proofing lab tests)
- Areas to discuss:
- a cover with handle
- a different casing finishing for developing countries or renting/ subscription services
- a rubber casing like handphone
- The on/off switch cover
- the final costing of the Block
- the initial small batch of production to test the renting/ swapping
- IP 68 battery pack yet can float on water
- in fresh water
- in sea water
- the internal boards to have water proofing

29 December 2019
MVP – Final phase assembling before certification – Prototyping for Energy Lock ONLY – 1st part
- 1st phase is out
- it will be 110 cm. this is good enough for developing nations
- a upgraded version will be looked into after this version is done
- Direction
- split DC & AC separately
- its like 2 cake to put on below depending on the requirement
- Direction

24 December 2019
MVP – Final phase assembling before certification – Prototyping for Jig ONLY – 1st part
- wiring has been done for 24v (e-scooter), 36v (e-road-bike), 48v (chine-version-e-bike) micro-mobility
- only one jig will be fitted with board and put it on different micro-mobility for testing
- simple test on turning on and checking the e-bikes work have been test
- these 2 days it will be hang on e-bike and be ridden all around
- one jig will be sent to Singapore.
- once ok, the rest of the 4 sample boards will be fabricated to test with more light-mobility.
22 December 2019
MVP – Final phase assembling before certification – Prototyping for Jig ONLY – 1st part
- MVP Jig for 24, 36,48, 60V created
- tested on 48 V electric-bike
- will be transferred to 24,36, 60 v
- as the Locking mechanism is not enought, we only have one jig to test

22 December 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- 2nd draft of locking mechanism done and tested successfully
- All main issues are solved now and hardware development will proceed again and alot of fine tuning
- Energy block USB A, C & DC output all working
- Adaptor prototyping sent out: to be readied by 26th Dec 2019
- 2 blocks will be sealed with sim card to test the waterproof function. One will be sent to Singapore
18 December 2019
Vision, Mission, Story, Tagline
- A Vision:
- Transforming energy ownership for a greener world.
- By first, commoditising renewable energy by containing it in the safest and lightest energy block that can power all sorts of consumer electronics and electric mobilities.
- This will Innovate energy ownership where consumers will be able to produce, track different types of stored-energy & exchange the excess energy between others users on a platform.
- B / Missions statements:
- Anzene aims to achieve the vision with 6 mission statements standards
- Standardized – can be used in many appliances and light mobility devices
- Safe – the in-built fire extinguisher will extinguish any heat or fires detected
- Smart – stats & data driven, connected to mobile
- Swappable – almost zero down time; save time from charging it up5. Stackable – can power bigger devices
- Sustainable – up to 90% recyclability rate after shelf life is up
- C / Tagline:
- Powering Freedom
- Improving life with electricity (in China – 用电改进生活)
- D / Story:
- Cultural Background:
- Being a Singaporean start-up company, we recognize the importance of sharing and being familial to friends and family. And we have decided to promote that trait and encourage everyone to practice sharing in most occasions.
- We have incorporated that trait into the Anzene start-up battery pack. In which, sharing of battery energy among friends and other e-bike users is also possible.
- Being an Asian company, we are also much more aware of climate change and how it affects our continent negatively. Because of this, we have made Anzene in such a way that it combats the main problem with e-bikes: its contribution to global warming and climate change.
- That is why Anzene makes use of smart energy rather than wasting electrical energy from burnt fossil fuels.
- About us:
- Anzena was invented due to two reasons:
- ) Ai.Yun Wong, the CEO, is concerned with the environment but still wants to continue using his e-bike; and
- ) The same problem is experienced by Wong’s colleagues.
- Having encountered such a problem, Wong used his background in designing cars from his previous job of design at Tesla in order to answer such a problem.
- Ultimately, he came to the conclusion that a smart battery pack would be the most effective solution.
- And so, with his other colleagues, he designed Anzene. A lot of revisions and months later, he decided to launch the first product in Anzene’s line after meeting his own high standards and wants.
- Cultural Background:
- Anzene aims to achieve the vision with 6 mission statements standards
26 November 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- Male Ball Bearing sample done.

23 November 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- sample done for the ball bearing male side

20 November 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- ball bearing lock mechanicm done.
- smaller toggle pins arrived
- waiting for few others parts to come and test on 25th Nov
- breakdown of battery pack/ energy block’s cost of parts
- FPC soldering solved.

12 November 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- Magnet design has to be removed due to the following reasons
- .a. our toggle pins need 4 kg of force and it require a large number of magnets both sides
- .b. it increases the cost too much
- .c. Certification body would not allow it due to too big electro-magnetic field
- .d. the risk of breaking into pieces is very high and will pose lots of risk
- *solution has been found to use a hardware ball bearing with spring loaded that will exact 4 kg of force. sampling has started and will take 1 week to confirm
- Benefits:
- .a. Cheaper
- .b. Lighter
- .c. last longer
- photos of different scenes will be used on different mobility bikes to show our ‘small’ size can be retrofitted on any mobility
- rubber padding between the cells and touching cells’ jigs to casing have been made. to reduce any vibration of the cells to the max
- updated timeline: Jig, Lock, Block to finish by Dec 2019
- All software/ hardware for the final pieces of Energy router/ charging stations & motorbike have been quantified. Different contracts from all the suppliers will be uploaded soon

20 October 2019
Anzene new logo initiative
- characters build up for
- the Japanese marten that can be an energy-power character
- the Japanese marten that can be a messaging character
- the Japanese marten that can be a home security character
- The Japanese marten that can be a electric-mobility character

15 October 2019
Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- PMD Jig tested connection with block and working
- Adaptor tested connection with block and working
- Adaptor will not have ID assembled for exhibition. It will be raw model to show functionalities
- The connection using magnets are not the best method. solution will be looked into

16 September 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 4th part –
- This version will be sent to HQ for vetting check.

12 September 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- Energy Block Toggle pins has arrived.
- Adaptor, Router, PMD Jig toggle-pins side have not arrived as PCB board’s parts have not arrived. company will try to rush after holiday: The quality is good: fits perfectly with anti-explosion valve
- Certification research lab has been contacted, and confirmed
- Mold suppliers for metals parts & Cover, plastics material have been contacted, met and in final discussion
- Sub and overall assembling companies have been contacted, met and in final discussion
- 1st sample production lead time has been discussed to test and improve and use for exhibition presentation
- JV has been confirmed @ 80% to 20% (Anzene Singapore 80%)
- Patent filing for local and oversea details & process have been confirmed
- Whats Next: Mold confirmation, arrangement for exhibition, Citic @ Beijing, 433 @ Beijing, Toggle pin @ Luoyang, CFE @ Yichang

5 september 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- Improved FPC cable arrived: for lazering welding and black in color
- Welding’s strength between FPC cable and battery cells’ jig has been solved.
- GPS connectivity solved from improved Battery block’s cover
- Improved and strength of energy block casing has been done. It has gone through hardening treatment
- Different logo effects have been done for singapore side to confirm
- DC2DC board gone through few more times of improvement: 19v2.4amp to 19v3.5amp: total output watt increased from 90w to 110w
- PMD jig has been adjusted for 24, 36, 48, 60v & with heat flow check
- Adaptor’s AC & DC output have been done: Will be sent for assembly fitting for external shelves
- A simplified version for PMD jig has been done
- All PCBs boards are in black color now

22 August 2019
Lishen Battery Provider
- Discussion about the series (LR2170SA_4.0Ah) have been initiated.
- Battery composition is NCM (Nickel Cobalt Manganese Oxide based)
- Positive electrode: Metal oxide (40-45%)
- Negative electrode: Graphite: (20-25%)
- Electrolyte: Organic Electrolyte: (11-14%)
- Aluminium Foil: (10-12%)
- Copper Foil: (6-9%)
- Diaphram: /
- What is NCM battery?
- Category : LiNiMnCo (NMC) Batteries
- Lithium Nickel Manganese Cobalt Oxide also lithium-mananese-cobalt-oxide (LiNiMnCo, NMC, NCM), Li[NiMnCo]O2 based Cathode & Graphite based Anode, is the newest generation Li-Ion rechargeable battery for high power applications, such as EV car, E-scooter and E-bike.

19 August 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- testing of the 4G & GPS at the rooftop
- firmware tested & Functioning properly
- signal not so strong when assembled to the block
- need to test one more thing to ensure stability of signal. The base is aluminium and its absorbing too much.
- the status of the cells can be checked from this link: http://139.159.180.149/sharecar/index.php?id=866272042478139

17 August 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 3rd part
- Energy block’s DC-DC PCB board for USB-A, USB-C, laptop DC: Connected & Functioning properly
- Energy block’s sensitive-touch pad for USB-A, USB-C, laptop DC: Connected & Functioning properly
- Energy block’s BMS reading battery cells, connecting 4G boards & DC-DC boards: Connected & Functioning properly
- Energy block with PMD jig powering up an electric bike: Connected & Functioning properly
- Energy block with PMD jig powering up an electric bike on the multi-directional toggle pin (male side): Connected & Functioning properly
- One of sample before committing – A: Energy block internal parts will go through one more time improvement. All PCB boards to change to black with chips’ serial number blanken. FPC cable improvement. On/ off sensitive-torch pad adjustment. All assembled to test with 2nd-batch of male/female toggle pins.
- One of sample before committing – B: PMD jig to go improvement for water ponding challenges & a cheaper version for B-B. and to have 2-5x units of PMD jig to test for electric vehicles
- 2x units of simplified Energy router will be prepared for testing of the software app with energy blocks. Simplified version (does not have push back, does not have lock on the block)

17 August 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 2nd part
- FPC cable collected and sent to lazer spotting on the points connecting the cells
- due to the difference in material, the quality is still not good enough
- few more samples have to be sent this lazer company for testing
- Battery pack is assemble to test PMD Jig with software
- all boards are powered up except offline communication
12 August 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 2nd part
- Secure assembly of 4g, wifi, GPS
- 2 slots are made for 433

10 August 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 2nd part
- DC-DC section fixed into the block.
- USB A IP67-68 will only be readied end of Aug. The one on the current block is another version.
- improved external shell
- improved internal seal casing
- Set up PMD jig to a bike for testing soon
- 300w sine wave for adaptor got it for suggested sizing
- Improved aluminium plate
- Improved Cells Jig
- Improved anti-static

23 July 2019
Energy Block 4G PCB APK – Android application package
- a simplified version to manage the 4G board in energy block
- to manage testing with bluetooth beacon, 433, 4G

23 July 2019
Creating fire from electricity
23 July 2019
Energy Block Female and Male Toggle Pins
- Female version has upgraded to the new design to preventing water pooling
- there will still be degree slanted.
- Development team not happy with the current design even with the Male pins with spring. fatigue/ vibration/ PMD not strong, pin will be out of contact
- this design will prevent 2 things: water pooling and
contact issue

21 July 2019
Energy Block Female and Male Toggle Pins
- Female version on the energy block is readied
- the male pins inside the block are thicker and coated with special process coating that can last for 10 000 times and at 30 amp.
- the magnet has arrived too. Tested. quite strong. has to be tested few more times when assembled for better UX experience as afraid maybe too strong
- waiting for base the PCB boards with the pins. To be sent over end of July.

21 July 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 1st part –
- 3rd version is readied
- with on/off button
- with 4 lights around the on/ off button
- USB A port (a normal one first – IP 67/68 waiting)
- USB C port (IP 67/68 standard)
- 19V DC port (IP 67/68 standard)
21 July 2019
Energy Block DC-DC PCB board with chip
- 3rd version is readied
- with on/off button
- with 4 lights around the on/ off button
- USB A port (a normal one first – IP 67/68 waiting)
- USB C port (IP 67/68 standard)
- 19V DC port (IP 67/68 standard)

20 July 2019
PMD Jig
- 1st hardware is readied
- it will be fitted with PCBs board that output 36v first
- it will then be fitted on a 36v ninebot scooter for testing
- 400w Jig board

20 July 2019
Air Pressure Value
- a new standard that the entire team forgot that battery pack needs to have an air pressure valve
- a customisation has been done to suit to the Anzene Energy Block
- it would be installed on the bottom. so if things happen, it would release on the bottom instead shooting up
- if there is an built up air pressure, the membrane would be broken and release the built-up-air-pressure
- its a IP67/68
- on the context, if a naughty boy wants to use a needle to forcefully poke, the membrane will be broken
- Anzene Energy block will be double layer protection no top and bottom covers.
- so the inner layer at another corner at the bottom cover, another Air Pressure Value will be installed so if a naughty boy really does it, it will still have an active valve for built-up-air-pressure

3 July 2019
IP67/68 USB A
- USB A with IP67/68 rating is the only one that could not be found.
- To do it, a new mold is needed for reconstructing.
- After few rounds of negotiation, the contract is downsized to 60 000 rmb. 50 000 rmb for deposit. 10 000 rmb after finishing.
3 July 2019
MVP – Final phase assembling before certification – Prototyping for Energy Block ONLY – 1st part
- *What happens on the assembling day:
- 3 sets of the entire BOM of energy block is produced and prepared
- ii: 2 sets will be assembled on the A-Day. 1 Sealed with 1 SGP sim card and 1 with China Sim card
- iii: The entire assembling process will be carried on real time to check for final issues and updated with the final BOM price list – certification official will join.
- iv: The 2 sets would be used for certification
- v: Remaining one set would wait for USB-A that has IP67/68 for complete IP67/68 certification. So far, all our parts have the sealing and USB-C & DC Barrel all have standalone IP67/68.
- vi: While waiting, one set will be sent to Singapore without seal to experience the assembling process. It will be collected back once USB-A is readied
- @This assembly does not include a IP^&/68 pressure-release-valve if there is inbuilt pressure inside like explosion – why? – no time for a specific dimension – it would not affect the entire structure@
- @@The bottleneck is by the company doing the toggle pin@
- @@@after this is done, a relook into the design is needed for weigh-reduction, and expansion capabilities

16 June 2019
Energy Block BMS Logic System Overview
- Authentication steps of Energy Block when connected with Energy Lock/ PMD Jig/ E-motorcycle Jig via toggle pins:
- Activated by Hot-wiring circuit between Energy block and respective hardware (check here for more information: https://zh.m.wikipedia.org/…/%E7%9F%AD%E6%8E%A5%E5%90…
- When true, Energy Block’s BMS activated
- Connected hardware’s bluetooth powerup & activated
- Connected hardware’s bluetooth authenticating with Energy Block’ bluetooth
- Energy Block’s bluetooth will then inform BMS then 4G board to the centralised platform
- *Toggle pin is forever without electricity when its not connected
- .b.Authentication steps of Energy Block when connected with Energy router via toggle pins:
- Activated by Router’s 5v signal pin
- Authentication with BMS will be transferred to the centralised platform via router’s 4G Board.
- *Toggle pin is forever without electricity when its not connected
4 June 2019
Anzene’s Illustration of e-bike, escooter, portable desk coworking spaces with Public/ Private

4 June 2019
Anzene’s Illustration of Portable desk for Coworking spaces
- There are 3 design approaches.
- Each is sold at $200 ~
- We do know the cost of this yet as it has yet to be quoted with the engineering drawing.
- Each design has been improved to house Energy Block
- Illustration will be done soon with Design 3
- *Design has been confirmed to fit with Energy block. The illustration will be made to showcase to let Frontline team to share. but production of if will be expensive if we are to produce only a few. So Frontline will focus on MOU first and present ebike, escooters and co-working work space.



4 June 2019
Anzene Power Adaptor – ACDC
- Due to our size and emphasis of Energy Lock for 300w, the ACDC charging cannot be integrated into the Lock
- There will be an adaptor
- This adaptor will be very small and push up to 130W
- it would be smaller than Mac book adaptor
- Discussion to make this unique, small and more functional. 1+1>2 principle
- Research will be supported with Weijian especially after the first Crowdfunding partners worked and tested on Advene
4 June 2019
Anzene new logo initiative
- More flat designs of Anzene Mascot (This is selected and expand from a main flat representation for brand consistency)

4 June 2019
Anzene Distributed Communication – Ensuring 24/7 communication when GSM is down
- EXTENSIBILITY
- Internet Modem: Need internet in the wilderness? Leave one Sonnet connected to your internet modem and carry another with you, allowing you internet access.
- Cellular Dongle: Share cellular connection for the entire network by connecting your Sonnet to a cellular dongle.
- Solar Panel: Connect your Sonnet to a solar panel, and turn it into a powerful, permanent signal repeater at any location on your network.
- Sensor: Use the Sonnet with sensors and create a monitoring network that easily covers a property of 100 square km – operated remotely.
- Vehicle/Drone: To improve the Sonnet’s line of sight and range, use the Sonnet’s mount screw to position it on the top of a vehicle or drone, improving your signal strength.
- Satellite Phone: Connect one Sonnet to a satellite phone and share your signal with your entire mesh network across potentially thousands of hectares, meaning only one of your team members needs a satellite phone

4 June 2019
Anzene partners/ suppliers – Hot-cold connector pins/ toggle pins
- a listed & very old China company will work with us
- more specific information will be provided
- for now, it will be good for all kinds of insertion (north, south, east, west, left, right, up, down), with magnet and XX usage and high amp pass through – the supreme pizza connector that has all the goodies
- Attached some photos

24 April 2019
Anzene ID Designs
- Consisting
- Battery-energy block
- Battery-energy lock
- Battery-energy router
- Final round
- Mold and assembly trails will be done to this standards
- Improvements
- All improvement will only come after the round of producing it out

24 April 2019
Anzene new logo initiative
- Mascot
- Japanese Marten
- a representation for lightning
- and some improvement of fingerprint styles
- Japanese Marten

23 April 2019
MVP Prototyping for battery pack, docking station to cloud database linkup & behind the work scene – ignoring exterior industrial design
- The size of the shell remains unchanged, the inner diameter is + 0.3, and insulating paint is used at the same time.
- There are four sets of testing tools, two of which are manufactured and two are delivered for production and backup.
- The upper and lower inner chamfers
- Front-end 1 mm frame, assembly positioning, waterproof, weekly drawings
- battery-cells jig improvement
- each external R angle must be consistent
- the USB cover and the outside must be the same color, using the same technology separately.
- ID designer will confirm the color on final product
- burrs must be removed
- wiring arrangement and hot plugging adopt electronic factory direct welding as fast plugging mode
- coordination of sim-cards
- determine the bottom magnet on the bottom of battery-energy block
- the same antenna or all enclosure antennas are used in the antenna scheme.
- the module unifies one specification screw
- Current top-bottom cover is like plastic is called glass-glossy-paint. The disadvantage is that it is easy to change color.

11 March 2019
MVP Prototyping for battery pack, docking station to cloud database linkup & behind the work scene – ignoring exterior industrial design
- Hardware MVP for the system will be available before this month ends.
- *photos and videos will be uploaded and hardware to be brought back Singapore.
- **Questions raised about the hardware:
- 1)what’s the stage of docking station now?
- ans: energy block router coming out together with energy block this month (mar 2019)
- How is the DCDC module?
ans: coming out after energy block router and energy block. It will be on the jgi - For data connection, can pair with user’s phone?
ans: yes - is there a dongle module for stacking 2 or more ?Anzenes together?
ans: no for the first phase launch. it is another product and needs to be designed and created.

9 March 2019
Anzene on Home Appliances Illustration – DSLR camera

9 March 2019
Anzene on Home Appliances Illustration – Desktop

9 March 2019
Anzene on Home Appliances Illustration – Laptop

9 March 2019
Anzene on Home Appliances Illustration – Television

9 March 2019
Anzene on Home Appliances Illustration – Mobile

9 March 2019
Anzene on Home Appliances Illustration – Fridge

9 March 2019
Anzene on Home Appliances Illustration – Camera lighting

9 March 2019
Anzene on Home Appliances Illustration – Fan

9 March 2019
Anzene on Factory support Illustration – Standard and mini Forklift

29 January 2019
Mold-Jig for internal battery cells
- battery plastic jig holder solved
- having issues and difficulties as everything is too thin and small. Keep failing due to the extreme difficulty of the 80*80*240mm

28 January 2019
Anzene Collaboration Illustration – With Grab Food & Uber

27 January 2019
Anzene Design Illustration – Battery Pack & Brain Separated Concept


27 January 2019
Anzene on Home Appliances Illustration – Electric Car Starter

27 January 2019
Anzene on Home Appliances Illustration – Washing Machine

27 January 2019
Anzene on Home Appliances Illustration – Drone Charger

27 January 2019
Anzene on Home Appliances Illustration – Light Electric Car

27 January 2019
Anzene Portable Home – Power Unit Illustration

27 January 2019
Anzene on Home Appliances Illustration – Grass Mower

27 January 2019
Anzene on Home Appliances Illustration – Electric Bicycles

27 January 2019
Anzene on Home Appliances Illustration – Electric Wheelchair

13 January 2019
Anzene Universal Adaptor known as Energy Lock
- Output:
- 1x QC 3.0 C
- 5V/3A, 9V/3A, 12V/3A, 15V/3A, 20V/3A, 20V/5A @ Max 100
- 1x QC 3.0 C
- 5V/3A, 9V/3A, 12V/3A, 15V/3A, 20V/3A, 20V/5A @ Max 100W
- 1x QC 3.0 A
- 5V/3A, 9V/2A, 12V/1.5A @ Max 18W
- 1x QC 3.0 A
- 5V/3A, 9V/2A, 12V/1.5A @ Max 18W
- 1x DC output:
- 5-60V up to 8A, with 0.1 V/A increment @ 150W
- 1x AC output:
- 100V~120V 60Hz / 220V~240V 50Hz (1 output port) @ 120W, Pure sine wave
- 1x LED light: 3W
- Input:
- DC Input (Can use from AC, Solar, Wind, Car)
- 5V – 32V, up to 4.5A @ 90W Max
- Hard Functions:
- Plug

4 January 2019
Anzene Batter Pack
Internal Battery Casing with Tesla Soldering process testing